Hello Guest User,
Please feel free to have a look around the forum but be aware that as an unregistered guest you can't see all of it and you can't post.
To access these 'Registered Users Only' areas simply register and login.
Please feel free to have a look around the forum but be aware that as an unregistered guest you can't see all of it and you can't post.
To access these 'Registered Users Only' areas simply register and login.
Well New Project time!
Moderators: KeithZ1R, chrisu, paul doran, Taffus
- Ginger Bear
- Hardcore
- Posts: 6850
- Joined: 16th Dec 2008
- Location: In the Dark.
- Contact:
-
- Hardcore
- Posts: 1460
- Joined: 8th Nov 2011
- Location: Brisbane, Australia.
Hey GB,
Have not got a clue, but I have sent an email to Joe asking him.
Reckon someone on here will know.
Have not got a clue, but I have sent an email to Joe asking him.
Reckon someone on here will know.
Z1000R ELR, Z1100R ELR, GPz900R A1, GPz750 Turbo, Norton F1, Harris Mag 2, Harris Mag 5, Yamaha YZR750SP, Triumph Steve McQueen, Suzuki RGV250 Sheene Rep, Suzuki RG500 Walter Wolf, Suzuki RG250 Walter Wolf, Aprilia RS250, Yamaha YL1, RG500. H**** NS400.
think its a typing error, as he has given reference numbers for two different adjustable sprockets ?
http://kzzone.com/sprockets.html
http://kzzone.com/sprockets.html
👀 👀 👀
email - adrianhorsfield@live.co.uk
email - adrianhorsfield@live.co.uk
- Ginger Bear
- Hardcore
- Posts: 6850
- Joined: 16th Dec 2008
- Location: In the Dark.
- Contact:
-
- Hardcore
- Posts: 1460
- Joined: 8th Nov 2011
- Location: Brisbane, Australia.
Here you go GB.
Ian
That is an easy one.
When your head and cylinder were built, we used a 1977 KZ1000 head provided by you from Melvin Ormel.
We originally installed 30 tooth sprockets and recorded that on the invoice.
When you changed gears and wanted us to build the complete motor using a KZ1000 Mark 2 bottom end, we changed the camshaft sprockets, but not the invoice.
If the sprockets had been mismatched, we could never have timed the camshafts and checking compression would have led to bending every valve.
Z1000R ELR, Z1100R ELR, GPz900R A1, GPz750 Turbo, Norton F1, Harris Mag 2, Harris Mag 5, Yamaha YZR750SP, Triumph Steve McQueen, Suzuki RGV250 Sheene Rep, Suzuki RG500 Walter Wolf, Suzuki RG250 Walter Wolf, Aprilia RS250, Yamaha YL1, RG500. H**** NS400.
- Ginger Bear
- Hardcore
- Posts: 6850
- Joined: 16th Dec 2008
- Location: In the Dark.
- Contact:
I should hope Joe does know what he's doing after all that invoice list
Ian, I'm looking forward to more news of this build.
Best wishes

Ian, I'm looking forward to more news of this build.
Best wishes

Non standard Z900 - purchased from HIGGSPEED - http://www.higgspeed.com/ -
http://www.z1ownersclub.co.uk/forum/vie ... 6a7d5e816c
http://www.z1ownersclub.co.uk/forum/vie ... 6a7d5e816c
-
- Hardcore
- Posts: 1460
- Joined: 8th Nov 2011
- Location: Brisbane, Australia.
Just waiting for Harris now, still reckon it's going to be next year until I see it!
They have to fit the fairing and make sure all the brackets are their, the ones that are not needed with be removed. The tank needs to be altered because there is a big gap now since we are not using the original tail unit, the wheels need to be fitted and spaces made, new discs are being made as well. Then it will all need to be stripped ready for powder coating, after that it will be boxed up and sent down here by boat! So even if it was ready now and sent in the morning I'd only see it at the beginning of November anyway
They have to fit the fairing and make sure all the brackets are their, the ones that are not needed with be removed. The tank needs to be altered because there is a big gap now since we are not using the original tail unit, the wheels need to be fitted and spaces made, new discs are being made as well. Then it will all need to be stripped ready for powder coating, after that it will be boxed up and sent down here by boat! So even if it was ready now and sent in the morning I'd only see it at the beginning of November anyway

Z1000R ELR, Z1100R ELR, GPz900R A1, GPz750 Turbo, Norton F1, Harris Mag 2, Harris Mag 5, Yamaha YZR750SP, Triumph Steve McQueen, Suzuki RGV250 Sheene Rep, Suzuki RG500 Walter Wolf, Suzuki RG250 Walter Wolf, Aprilia RS250, Yamaha YL1, RG500. H**** NS400.
-
- Hardcore
- Posts: 1460
- Joined: 8th Nov 2011
- Location: Brisbane, Australia.
Just got an email from UPS and my engine is in Sydney, they have estimated delivery to me within two day
It's like Christmas in September.

It's like Christmas in September.
Z1000R ELR, Z1100R ELR, GPz900R A1, GPz750 Turbo, Norton F1, Harris Mag 2, Harris Mag 5, Yamaha YZR750SP, Triumph Steve McQueen, Suzuki RGV250 Sheene Rep, Suzuki RG500 Walter Wolf, Suzuki RG250 Walter Wolf, Aprilia RS250, Yamaha YL1, RG500. H**** NS400.

Non standard Z900 - purchased from HIGGSPEED - http://www.higgspeed.com/ -
http://www.z1ownersclub.co.uk/forum/vie ... 6a7d5e816c
http://www.z1ownersclub.co.uk/forum/vie ... 6a7d5e816c
- Ginger Bear
- Hardcore
- Posts: 6850
- Joined: 16th Dec 2008
- Location: In the Dark.
- Contact:
Is Vic There wrote:Just waiting for Harris now, still reckon it's going to be next year until I see it!
They have to fit the fairing and make sure all the brackets are their, the ones that are not needed with be removed. The tank needs to be altered because there is a big gap now since we are not using the original tail unit, the wheels need to be fitted and spaces made, new discs are being made as well. Then it will all need to be stripped ready for powder coating, after that it will be boxed up and sent down here by boat! So even if it was ready now and sent in the morning I'd only see it at the beginning of November anyway
I hope Harris frames are better than Harris exhausts!!!

Jimmock.
SPEED IS JUST A QUESTION OF MONEY...HOW FAST DO 'YOU' WANT TO GO?
I hate people I don't like !

SPEED IS JUST A QUESTION OF MONEY...HOW FAST DO 'YOU' WANT TO GO?
I hate people I don't like !
jimmock wrote:Is Vic There wrote:Just waiting for Harris now, still reckon it's going to be next year until I see it!
They have to fit the fairing and make sure all the brackets are their, the ones that are not needed with be removed. The tank needs to be altered because there is a big gap now since we are not using the original tail unit, the wheels need to be fitted and spaces made, new discs are being made as well. Then it will all need to be stripped ready for powder coating, after that it will be boxed up and sent down here by boat! So even if it was ready now and sent in the morning I'd only see it at the beginning of November anyway
I hope Harris frames are better than Harris exhausts!!!
My dear Jimmock, Harris frames are much better than Norman Hyde frames!
Non standard Z900 - purchased from HIGGSPEED - http://www.higgspeed.com/ -
http://www.z1ownersclub.co.uk/forum/vie ... 6a7d5e816c
http://www.z1ownersclub.co.uk/forum/vie ... 6a7d5e816c
-
- Hardcore
- Posts: 1460
- Joined: 8th Nov 2011
- Location: Brisbane, Australia.
Well its in Brisbane, just been emailed a bill for $391
This covers customs clearance and airport terminal and handling charges!
Feel like I have just been bent over

This covers customs clearance and airport terminal and handling charges!
Feel like I have just been bent over

Z1000R ELR, Z1100R ELR, GPz900R A1, GPz750 Turbo, Norton F1, Harris Mag 2, Harris Mag 5, Yamaha YZR750SP, Triumph Steve McQueen, Suzuki RGV250 Sheene Rep, Suzuki RG500 Walter Wolf, Suzuki RG250 Walter Wolf, Aprilia RS250, Yamaha YL1, RG500. H**** NS400.
Who is online
Users browsing this forum: No registered users and 7 guests