






This is the basic outline of how I want the bike to turnout. The bodywork is away at Spraybay and should be back in the next 3 weeks.

Engine in the frame waiting to be stripped out.

This shows the parts of the frame Ash had strengthened and a spacer used for the ZXR750 H1 forks. I am having a set of yokes made with an original Z1000A2 stem and offset. This will allow me to use the standard Z1000A2 bearings in the headstock and will increase the steering lock which has been reduced with the ZXR yokes.



A couple of pictures of the engine this will be stripped down and have the barrels and head painted black with the casings polished up. The clutch was stuck when Ash got the bike back so this will be stripped down and new plates fitted. A Dyna 2000 ignition will be fitted along with Dyna coils and leads. The 29mm smoothbores will be refitted with K and N filters and a pingel tap.


A couple of photo's of the frame stripped. Plans are for a set of rearsets being made for the bike along with a bracket welded to the frame for a set of passenger pegs. A set of alloy headlight mounts and at the rear a small brembo brake will be mounted. The front brakes will be a set of Harrison Billet 6's I picked up off e bay. The rear wheel needs moving over by 7mm to line up in the ZRX1200 swingarm. Next pictures posted will hopefully see the freshly powdercoated frame with parts being photographed as they are added to the bike.
Cheers Padders.
I recieved the frame swingarm and wheels back from the powder coaters yesterday so set to with the rebuild. Below are 3 pictures showing progress so far. Hopefully post some more next weekend with the swingarm attached and shocks on etc.


