Hello Guest User,

Please feel free to have a look around the forum but be aware that as an unregistered guest you can't see all of it and you can't post.

To access these 'Registered Users Only' areas simply register and login.

Unce upon a time there was an A2

Work in Progress

Moderators: KeithZ1R, chrisu, paul doran, Taffus

Message
Author
breakdown

Unce upon a time there was an A2

#1 PostAuthor: breakdown » Wed Sep 09, 2009 9:47 pm

Well about three months ago, finaly got myself a Z1000. Hoping to have her finished for next summer ( if we get one that is). What I'm aiming for is just a nice clean an tidy Z which will be fairly standard, no show bike stuff, or anything fancy.
Image

what the engine looked like

Image

and the paint work lovely eh

Image

How she stood about a month ago

Now for some hidden horrors

Image
1 cam holder cracked

Image
the starter clutch

Image
can anybody spot the missing part

Tune in next week for the next exciting instalment ( don't worry the medication should kick in soon)
Last edited by breakdown on Thu Sep 10, 2009 5:12 pm, edited 1 time in total.

User avatar
paul doran
Area Rep.
Area Rep.
Posts: 15910
Joined: 24th Sep 2004
Location: near Dublin Ireland

#2 PostAuthor: paul doran » Thu Sep 10, 2009 7:18 am

somebody does'nt like starter motor's
way too many Zeds

breakdown

#3 PostAuthor: breakdown » Thu Sep 10, 2009 6:52 pm

Hi Paul, some folk have no respect for bikes, and should be taken out at dawn.

Image

Well this is how she sits at the moment, new spindles fitted S/S, as is most nuts n bolts,back end mostly complete as is the front end, still got to get the mudgaurds re-cromed, their ok'ish a bit tired looking so a freshin up needed. The engines still a work in progress,apart from the previous mentioned horrors everything else seems ok (whoooo!). The seat base needs a bit of work but can be saved, the foam an cover are good.

Image

Image

The paint work,mmmmmm British racing green(metallic) :D , still to get badged up and stripes. Well folks that' all just now, hoping to have the engine back together within the next two to three weeks. Later Folks oh yea Happy riding wherever you are

User avatar
paul doran
Area Rep.
Area Rep.
Posts: 15910
Joined: 24th Sep 2004
Location: near Dublin Ireland

#4 PostAuthor: paul doran » Thu Sep 10, 2009 7:30 pm

now that's looking much better
I like that paintwork
way too many Zeds

User avatar
colinj
100Club
100Club
Posts: 105
Joined: 3rd May 2009
Location: Uttoxeter

Paul's Project

#5 PostAuthor: colinj » Thu Sep 10, 2009 7:36 pm

Paul,
lovely paint, with mine coming up soon (ish) can I ask who did yours for you?

Regards, Colinj
"Life moves pretty fast. You don't stop and look around once in a while, you could miss it!"

Ferris Bueller

breakdown

#6 PostAuthor: breakdown » Thu Sep 10, 2009 7:45 pm

Hi folks, the paint was done by a local lad, well chuffed with the job, can't wait till it's complete.

User avatar
PJ
Hardcore
Hardcore
Posts: 3538
Joined: 2nd Dec 2008
Location: Halesowen, West Mids

#7 PostAuthor: PJ » Tue Dec 01, 2009 2:39 pm

breakdown wrote:Hi folks, the paint was done by a local lad, well chuffed with the job, can't wait till it's complete.


Breakdown, what's happening with the rebuild mate, not heard anything for a while?

Cheers

PJ
WHO NEEDS DRUGS - WHEN YOU HAVE A ZED!!

breakdown

#8 PostAuthor: breakdown » Tue Dec 01, 2009 6:37 pm

Hi PJ,
Sorry for not keeping you's up to date :oops: . But don't worry things are moving forward, just not as fast as I would hope, but I guess we've all been there so I'll spare the details. Anyway the engines all back together just finishing off the wiring, then it's oil and filter and petrol. She should fire up, good compression and full new ignition system so fingers crossed. Still waiting on the mudguards, and the odd wee bit, but certainly on the home straight. I'll try and get some pics up soon. promise :wink:

User avatar
Geoff Meager
ZedHead
ZedHead
Posts: 1140
Joined: 5th Apr 2007
Location: Dereham. Norfolk.

#9 PostAuthor: Geoff Meager » Tue Dec 01, 2009 9:47 pm

Can't wait to see the end result b/d ....
Like has been said ... Love that green paintwork

breakdown

#10 PostAuthor: breakdown » Sat Dec 12, 2009 1:13 pm

A Wee update lads,
Finally got the electrics sorted, ah the joy of fitting a 1970s motorcycle headlight into the shell. The problem turned out to be the a wire in the right handlebar switch unit earthing out, (which was my fault when I re-assembled the switch unit) all sorted now. pressed the starter and four lovely sparks at the plugs, Superb :D . Bit of a hold up with both mudgaurds so can't get the back end together, the front end is all done just need to fit mudgaurd. Brakes all bleed. seat going back together had to do a bit of repair work to the base, welding etc. Still a few loose ends to tie up, some brakets, tidy up the wiring, should really get a new harness, but funds dictate otherwise :roll: . Hoping to get her fired up over the Hols.
I know, need to try harder with the pics, my excuse " lazy ".
Later BD

User avatar
Geoff Meager
ZedHead
ZedHead
Posts: 1140
Joined: 5th Apr 2007
Location: Dereham. Norfolk.

#11 PostAuthor: Geoff Meager » Sat Dec 12, 2009 9:29 pm

Can't wait for the pix BD ....
______________
PAID UP MEMBER
WITH NO ZED


Return to “Projects”

Who is online

Users browsing this forum: No registered users and 7 guests