i Slung the bottom end in the frame for a final dry build of the chain/outrigger and a few other odds and sods to check:
Picked up latest batch of CNC parts, hence the build up:
Spindle on the right is for my Dads Duc TT2 replica.
Steel case saver fitted and clutch rod hole repositioned
Top left rear engine mount fitted:
I will have to take a sander to the 2 steel tubes welded into the frame as the inner faces are on the piss a wee bit, other than that, it fits well
Even better the chain will just contact the top of the flange of the steel channel before contacting the mount:
I then spent some considerable time

grinding down some of the posts by 0.1 to 0.3mm to get the outrigger plate dead flat on the ends of the posts and the bearing at the correct depth in the sprocket:
Now i can fit the clutch cylinder an see how much i have to cut off the new tool steel rod fitted:
The eagle eyed may have noticed in previous posts these rear sets i have printed in PLA from the design i did a while back:
Fitted them to get the correct position for the mounts/spacers i will be welding into the frame and check overall function, they even work

:
Also wanted to see how the linkage for the gear shift will fit, but i need to buy some rod for that. Quite happy with the shape fit and function, but when i got all the parts priced it was north of £400 which is a bit salty so im going to talk to my machinist about reducing the cost by using simpler parts (minimal relief and fillets). But i do like the releif which will match the other CNC parts i have made. Im in a quandry
