Sure am, it's a shame that I can't use the green ones as I have a set left over from the Eddie lawson rep
Rob
Hello Guest User,
Please feel free to have a look around the forum but be aware that as an unregistered guest you can't see all of it and you can't post.
To access these 'Registered Users Only' areas simply register and login.
Please feel free to have a look around the forum but be aware that as an unregistered guest you can't see all of it and you can't post.
To access these 'Registered Users Only' areas simply register and login.
And so it begins again - Classic endurance replica
Moderators: KeithZ1R, chrisu, paul doran, Taffus
-
- Hardcore
- Posts: 1435
- Joined: 24th Jun 2012
- Location: Northants
Just waiting for it to come back from Grumpys after the loom has been made. Also the fuel tap spigot is going to be moved backwards to clear the carburettors. I stripped the fuel tank and found that it's got some filler in it and a few dents, hopefully Simon can sort it out.
Once it's back I will get it running and check that everything thing works, then the final strip down will happen. All the parts will be sent off to get powdercoated and ceramic coated, along with new tyres. Once that is done a careful rebuild will happen, whist waiting for Simon to finish the paintwork. Not sure what colour yet, initially I didn't want another green bike, but I have seen some very nice endurance paint jobs, so I might have two green bikes in the garage.
Rob
Once it's back I will get it running and check that everything thing works, then the final strip down will happen. All the parts will be sent off to get powdercoated and ceramic coated, along with new tyres. Once that is done a careful rebuild will happen, whist waiting for Simon to finish the paintwork. Not sure what colour yet, initially I didn't want another green bike, but I have seen some very nice endurance paint jobs, so I might have two green bikes in the garage.
Rob
Z1000R/ZRX, RD 125LC, Zx7r , Endurance racer
Final part done before the strip down to make it all shiny and nice. I have just had the loom done by Gary Hurd at Grumpy's 1260 shop. Top quality job. So, now it turns over and all the lights work.
Next step, strip down this week, ready for the frame to have the final piece of welding done, folled by a trip to Aerocoats to get the powdercoating done.
Rob
Next step, strip down this week, ready for the frame to have the final piece of welding done, folled by a trip to Aerocoats to get the powdercoating done.
Rob
Z1000R/ZRX, RD 125LC, Zx7r , Endurance racer
Finally got it back together today and it ran after only a few seconds, so very happy. I have to check torque the engine bolts and get a bung to go in the clutch push rod seal as it has a side pull clutch cover fitted. There's a few squeaks and rattles, which I will check over. Photos to follow
Rob
Rob
Z1000R/ZRX, RD 125LC, Zx7r , Endurance racer
Who is online
Users browsing this forum: No registered users and 9 guests